Sunroom Reno 2019 (Part Two)

September 9 (Day 8)
The Styrofoam-insulated foundation walls are mostly in place after today. One more row to go, and some tweaking with the laser level, and they’ll be ready for the concrete, tomorrow or the next day. Some wet days ahead, looks like, so fingers crossed.

Foam Insulated Foundation Walls 2019-09-09 11.20.13

September 10 (Day 9)
By the end of day 9, the insulated walls of the foundation now appear to be ready for pouring concrete. The Styrofoam walls are at final height, the opening for the crawlspace door is framed and braced, the whole structure is leveled and braced, and a walkway is ready for human oversight of the concrete being poured down into the opening. Presumably tomorrow, weather permitting.

Insulated Foundation Ready for Concrete 2019-09-10 16.32.13

September 11 (Day 10)
Today, the Styrofoam-insulated foundation walls had their cement poured. Sadly, we were out of the house at the time (they came early) so we missed the photogenic drama of a giant articulating arm flying in the cement OVER the house and down into the walls. In other words, no pictures. (Sad face emoji)

More Cement 2019-09-11 13.02.52

One of the reasons we missed the pouring of the cement from over the roof is that we went out to order the solid vinyl flooring we had in mind. As often happens though, we hit a snag. The widest roll was not quite wide enough, and it would have meant ordering twice as much, and wasting almost half of it. We decided, after considering several options, to go with these vinyl planks. They look disturbing realistic, like weathered barn wood, but they’re vinyl and about an eighth of an inch thick. Bit more expensive than the full sheet, but way cheaper than having to buy TWO full sheets. Also, we can order only as much as we need, and apparently, single planks can, through the application of heat, be removed and replaced if they get wrecked. We brought home a couple of samples, and seeing it in situ we’ve landed on the darker barn board-looking choice.

Flooring Choices 2019-09-11 16.01.19

Laundry room: A part of the overall sunroom project will be a facelift for our little laundry room. The vinyl flooring from the old sunroom was recovered and will be re-used in the laundry room and back stairs. The horrible and ancient cabinet over the washer and dryer, which was hanging by a thread, was removed and will be repurposed in the shed, where it will hang by stronger threads if I do it right. New light fixtures in the laundry room and downstairs hall. And, in work that began and mostly finished today, the window in the laundry room moves a foot or so to the east, to allow for the slightly offset (from its original footprint) east wall of the new sunroom. Sorry, didn’t get before and after pictures.

September 12 (Day 11)
Work continued on the laundry room today. The drywall was replaced around the recently-moved window and the appliances were disconnected and moved into the garage.

2019-09-12 17.02.47

2019-09-12 17.03.44

Meanwhile, the upper part of the foundation wall (the part that remains above-grade) was sanded and a mesh applied. I think this is to help the final coat of parging to adhere to the wall.

2019-09-12 10.40.00
2019-09-12 17.05.58

September 13 (Day 12)
No pictures today… Work was done only in the laundry room, which is even emptier than yesterday as several layers of old flooring was ripped up (not a quiet process!) and some initial mudding of the walls. They will be back for a while tomorrow to do some parging on the foundation walls.

September 14 (Day 13)
A short day today (Saturday) – they just added the second (final) coat of parging to the outside walls of the foundation. No work on the laundry room, so it was a blissfully noise-free day.

Parging - 2nd coat - 2019-09-14 12.20.45